PERTH 2 FACILITY

Location: Shenton Park

Lettable IT Floor Area: 986m2

Rack Spaces per Data Hall: 120

Target PUE: 1.1

Lettable Non-IT Floor Area: 150m2

Certification: Uptime Institute Tier III Facility

Data Centre Connectivity

  • Carrier neutral with excellent connectivity services available
  • Diverse carrier rooms and cable pathways

Security

  • 24 x 7 x 365 on-site security personnel
  • Dual authentication access with iris scanning and proximity card access control
  • 24 x 7 security camera recording and digital archiving
  • Upgradable to meet SCEC, ASIO and other security classifications

Power

  • Dual busway power distribution throughout data halls
  • N+1 block redundant plant room design
  • Stage 1 – 6.6kV high voltage ring main
  • Stage 2 – 11kV
  • 1000kVA continuously rated integrated power modules
  • Onsite fuel storage for over 12 hours at full load, constant refill capability

Fit Out

  • Private 26 rack IT rooms
  • Kitchen area
  • Secure loading dock
  • Staging room
  • Lift ground to first floor

Cooling

  • Primary free air cooling
  • Secondary N+1 DX cooling system
  • Hot and cold aisle containment

Parking

  • On-grade secure parking