Financially Sound
The Metronode data centre design provides for tightly controlled capital expenditure and low operational overhead based on low PUE and a minimal maintenance requirement.
Metronode’s BladeRoom™ data centre system is modular, meaning that data centre growth can closely reflect demand. Removing the need to speculatively build large facilities on day one, sometimes followed by years of under-utilisation, can save significant amounts of money and materially improve return on capital invested by our clients. BladeRoom™ operating efficiencies also translate
to dramatic savings on power, maintenance and serviceability.
Reduce your Energy Costs
Look at the savings over ten years. With a PUE as low as 1.14 in some Australian climates, Metronode facilities can save you significant energy costs. Assuming $0.12 per kWh and 1 MW of IT load, a data centre with a PUE of 1.14 can save you over $9 million over ten years when compared to a legacy facility with a PUE of 2.0.