Sydney

Brett Diemar
Facilities Officer
I have been managing the Sydney Primary Node Metronode data centre since 2008. I started my career with Leighton by doing work experience at their head office. After completing further studies I have returned to join their telecommunications division. Before starting with Metronode I have worked with Telecom, UBS Bank, ABN AMRO and Vodafone on network computing. I have studied computing at Macquarie university and most recently completed a graduate certificate in management.
Metronode Facility
Our data centres are designed with power systems that include redundancy, uninterruptible power supplies and N+1 levels or greater and a backup generator system in the event of local failure. Through precision heating, cooling and ventilation, our data centres are capable of supporting even the most demanding high-power deployments. We have carefully considered airflow, temperature and humidity in the localisation of our centres and our measures are reflected in the zero downtime of this facility. Physical security is also a priority for Metronode, and we have implemented security, monitoring and facility management to ensure your digital assets are protected.
| Site | Specification |
|---|---|
| Site Name | Sydney, Rosebery |
| Site Size | 2,900 sqm |
| Loading | 100% capacity |
| Total down time | Zero down time |
| Key Features |
Location strategically selected on the fringe of Sydney’s CBD in a low risk environment. |
